top of page

Everything Low Voltage Switchgear in Association with BS61439-1:2011 & BS61439-2:2011

ElecSpec, bringing you reliable independent information and advice needed to ensure you get the most out of your requirements of Low Voltage Switchgear in accordance with the British Standards. 

Bare Essentials

Here you will find all the common applications of almost all Switchgear, covering the basics needed to start the formulation of your particular Switchgear Solution

Breakers & Switches

Breakers & Switches is pretty much the sole and essence of Switchgear and here you will find it all including, Air Circuit Breaker (ACB), Moulded Case Circuit Breaker (MCCB) and Fuse Switches

Manual & Automatic Control

System control is vital and an essential part of all Switchgear, no matter how little or how great, this can be inclusive of Systematic, Manual, Automated or an amalgamation of them all

Metering & Monitoring

harmonic-analysis-audit-250x250.jpg

All systems have various solution requirements for metering and monitoring, some governed (Part L), and some site-specific (Harmonics)

Protection & Tripping Systems

From downstream protection such as ACB & MCCB particular device solutions to upstream, such as Intertripping and Restricted Earth Fault, it's all included

Power Factor, Surge Suppression, Harmonic Filtration, etc...

Power Factor Correction, Surge Suppression, and many other systems are now extremely common with most applications, ensuring Switchgear designs are fully protected and efficient as possible

Testing & Commissioning

It's important the Switchgear works, it's important the Switchgear functions to how you want it, it's important it's safe. Testing and Commissioning is essential to ensure your system works correctly

Studies & Surveys

The various Site Studies and Surveys are all covered here to ensure you have everything in the bag

Building Services Integration

Finally how to integrate your system with everything else, formulating a complete and functional Integrated Building Services Solution

SIGN UP FOR OUR EMAIL UPDATES

Thanks, your one step closer to being ElecSpec Compliant

ElecSpec Logo.png
Designed around your specification, for all your Switchgear needs,
Igniting the Spark with ElecSpec

STAY CONNECTED WITH ELECSPEC

2020 ELECSPEC. ALL RIGHTS RESERVED

bottom of page