Absolute Essential Checklist
If you need further help on any subject either click the title and it takes you straight to more in-depth detail or hit the Contact Us Page and drop us a line, we will be straight back to you.
We have you covered.
Go through each point and when you have completed it just click the pencil, ticking off your requirements from top to bottom.
Once you have a full set of lightning strikes well done, you've just concreted your LV Requirements.
ElecSpec Compliant.
AEC - Your Full Switchboard Checklist




















































































Incoming ACB & Busbar Current Ratings
- 630A / 800A / 1000A / 1250A / 1600A / 2000A / 2500A / 3200A / 3600A / 4000A / 5000A / 6300A
- - - - - - - - - - - - -
Incoming Supplies Incomers & Buscouplers
- Transformer Incomer(s)
- Generators Incomer(s)
- Other Incomer(s)
- Buscoupler(s)
- - - - - - - - - - - - -
- N (Single Incomer - Primary)
- N+1 (Dual Incomer – Primary & Secondary)
- 2N (Primary Incomer – Buscoupler – Primary Incomer)
- 2N+1 (Dual Incomers – Primary & Secondary, Buscoupler, Dual Incomers – Primary & Secondary)
- Etc.
- - - - - - - - - - - - -
- 36KA
- 50KA
- 70KA
- 100KA
- Please note Busbars & Devices, both need to be rated to the associated Fault Rating
- - - - - - - - - - - - -
Switchboard Enclosure Specification
- Enclosure Sheet Metal Thickness
- Fully Welded Enclosure
- Mechanical Strength (Lifting)
- Paint Colour
- Protection against Electric Shock
- - - - - - - - - - - - -
- Standard 50mm
- Size as required, typically in 25mm increases
- - - - - - - - - - - - -
Cable Access – Front or Front & Rear
- Front Access (Cabling Accessible from the Front)
- Front & Rear Access (Cabling Accessible from the Rear)
- - - - - - - - - - - - -
Cable Entry – Top / Bottom / Special
- Top Entry / Bottom Entry
- Top Exit or Bottom Exit / Top & Bottom Exit
- Special, always detail it clearly and precisely
- - - - - - - - - - - - -
- There are more Forms but these are the main two, I wouldn't advise you specify anything less
- Form 3b Type 2 (Typically Panelboards, although Form 4 for me is a must)
- Form 4a Type 2 / Form 4b Type 5 / Form 4b Type 6 / Form 4b Type 7
- - - - - - - - - - - - -
- IP 31 is pretty standard for indoor use but others can be specified
- If its external you will have to consider enclosures (GRP or Containers)
- - - - - - - - - - - - -
- ACB’s
- MCCB’s
- Fuse Switches
- Isolators
- - - - - - - - - - - - -
- Non-Auto
- Thermal Magnetic (Schneider, TMD’s)
- Long & Instantaneous Protection (Micrologic – Schneider, ML 2’s)
- Long, Short & Instantaneous (Micrologic – Schneider, ML 5’s)
- Long, Short, Instantaneous & Earth Fault (Micrologic – Schneider, ML 6’s)
- Long, Short, Instantaneous & Earth Leakage (Micrologic – Schneider, ML 7’s)
- - - - - - - - - - - - -
- ACB – No Choice, all Fronted Push Buttons
- MCCB – Either Toggle or Door Interlocked Rotary Handle (Essential Read Up we Reckon)
- Fuse Switch – Door Interlocked Rotary Handle
- - - - - - - - - - - - -
- Fixed Pattern
- Plugin
- Withdrawable
- - - - - - - - - - - - -
- Percentage Amount Spare Capacity
- Copper Connections Only, Plugin Base or Fully Populated
- - - - - - - - - - - - -
- Mechanical, Castell / Ronis Interlocks
- Mechanical, Chain (Beldon) Interlocks
- - - - - - - - - - - - -
- Electrical, Simple Electrical Control
- Electrical, Break before Make Changeover
- Electrical, Make Before Breaker Changeover (Synchronising)
- Electrical, Load Shedding
- Electrical, PLC – Everything Else
- - - - - - - - - - - - -
- Location
- Specification from Basic / Intermediate / Advanced Metering Solutions
- - - - - - - - - - - - -
Surge Suppression & Power Factor Correction
- Surge Suppresion, Type 1 & Type 2
- Power Factor Correction - Size & with/without reactors (Detuned / Non Detuned)
- - - - - - - - - - - - -
- Inter tripping
- Restricted Earth Fault
- Neutral Earthing Contactors
- Neutral Earth Connection
- Active Harmonic Filtration
- - - - - - - - - - - - -
!Design Verification! - DON'T APPROVE A SWITCHBOARD WITHOUT SEEING THESE
- Short Circuit Certification
- Busbar Certification
- Earth Bar Certification
- Temperature Rise
- Switch Room Operational Temperature 40 Degrees C
- Busbar / ACB / MCCB Certification
- - - - - - - - - - - - -